Modular homes involve modules of a home being made in a factory environment before being consolidated into a home. The individual modules of the home are constructed independently. One large structure is formed by bringing all the modules together. Individual modules are inspected carefully during construction to ensure they meet the required standards. The inspection is done by the department of quality control of the constructing company. This ensures that the modules are of high quality before they are assembled. This is worth knowing about South Hill VA modular homes.
These structures are usually not subjected to elements of weather like houses built traditionally are. That means that the production process is no interrupted by bad weather. As such, production can be done very fast. Also, the company can maintain a night shift crew that continues with the production even at night. In the end, the house is produced very fast.
A number of factors like bad weather usually affect construction of normal houses. For instance, the construction process has to be stopped when a storm comes. In addition, most normal houses are constructed from morning hours to evening hours after which the crew leaves the site and resumes work the following day. This makes the construction process to take longer. As such, several months may be required to construct a single home.
Many people are opting for modular houses because of the ease of construction that is involved. Modules can be produced very fast, with the average time being four weeks. Once the modules have been constructed, they are covered using appropriate material to protect them from elements of the weather during transportation. They are then transported to the site of installation where they are installed.
A foundation is usually made in advance at the site where the modules will be installed. Each module is installed individually on the foundation. The modules are offloaded from the transporting truck by use of a crane. They are placed onto the foundation by the crane in the required position. How this should be done is planned in advance.
Although the mean time for construction of the modules is 4 weeks, the time may vary a lot. Factors such as the design of the structure usually determine how long the duration takes. Complex structures take long due to the fact that there is a lot of designing and planning that is involved. The size of the structure will also determine the duration because structures with more modules require more time.
Extra time is needed to complete the installation process. The construction company or local builders can be hired to complete the installation. It is the client who determines who will do the installation. However, most production companies prefer to complete the process. The job can be assigned to either an outsider contractor or the construction company by the client because it is their choice.
It is important to note that modular homes are not the same as mobile houses. The first difference between these two kinds of structures is mobility. Whereas mobile houses are mobile, modular homes are not mobile. They are installed on permanent foundations, which prevents them from being able to be moved.
These structures are usually not subjected to elements of weather like houses built traditionally are. That means that the production process is no interrupted by bad weather. As such, production can be done very fast. Also, the company can maintain a night shift crew that continues with the production even at night. In the end, the house is produced very fast.
A number of factors like bad weather usually affect construction of normal houses. For instance, the construction process has to be stopped when a storm comes. In addition, most normal houses are constructed from morning hours to evening hours after which the crew leaves the site and resumes work the following day. This makes the construction process to take longer. As such, several months may be required to construct a single home.
Many people are opting for modular houses because of the ease of construction that is involved. Modules can be produced very fast, with the average time being four weeks. Once the modules have been constructed, they are covered using appropriate material to protect them from elements of the weather during transportation. They are then transported to the site of installation where they are installed.
A foundation is usually made in advance at the site where the modules will be installed. Each module is installed individually on the foundation. The modules are offloaded from the transporting truck by use of a crane. They are placed onto the foundation by the crane in the required position. How this should be done is planned in advance.
Although the mean time for construction of the modules is 4 weeks, the time may vary a lot. Factors such as the design of the structure usually determine how long the duration takes. Complex structures take long due to the fact that there is a lot of designing and planning that is involved. The size of the structure will also determine the duration because structures with more modules require more time.
Extra time is needed to complete the installation process. The construction company or local builders can be hired to complete the installation. It is the client who determines who will do the installation. However, most production companies prefer to complete the process. The job can be assigned to either an outsider contractor or the construction company by the client because it is their choice.
It is important to note that modular homes are not the same as mobile houses. The first difference between these two kinds of structures is mobility. Whereas mobile houses are mobile, modular homes are not mobile. They are installed on permanent foundations, which prevents them from being able to be moved.
About the Author:
Get great tips for choosing a builder of South Hill VA modular homes and more info about a reputable builder at http://www.haleyshomesinc.com/Modulars_Main_page.html right now.